Tropika @ Ferringhi Park work progress |
|
|
|

Overall view of 32 units Semi Detached from proposed Bungalow Plot
|
|

External building finishes (Aluminum frame and louvers) in progress for Semi Detached Type B
|
|
|
|

Laying of drain culvert in progress. Internal road with conceal drain concept and wider side walk way
|
|

Completed external finishes Semi detached type A for plot 106 to 111
|
|
|
|

Ariel view of Semi detached Type A for Plot 100-101 and Plot 105 (Conner Plot)
|
|

Pipe sleeve for under ground cable in place
| |
|
|

Floor marble for master bathroom semi detached Type B completed
|
|

Car porch base preparation and leveling in progress for Semi detached type B plot 129
| |
|
|
|